Refinishing the Sole


After the diesel day tank was replaced with a new aluminum one, the teak/ holly sole had to be replaced in the lower salon that had been removed to gain access to the tank.

The next step will be to sand down the lower salon sole completely and then refinish using 2 coats of gloss and a top coat of satin varnish. This is the first step in the eventual refinishing of all the sole throughout the boat.

IMG_3137

IMG_3175

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s